RQAW was selected to design this minor structural overlay. Originally the scope of the project included a substantial amount of widening. When we received the project, RQAW immediately performed a preliminary cost estimate to ensure the project budget would...
RQAW
SR 234 HMA Overlay
This partial 3R, minor structural overlay project located in Montgomery County was 11 miles in length and extended through the Town of Ladoga. The cross-section of the roadway remained unchanged, except at locations where two-ft shoulders were added within the...
Old Meridian and Carmel Dr./Pennsylvania Ave.
The project included full-depth QC/QA HMA pavement construction, small structure installations, extensive utility coordination, and ADA concrete curb ramps. Project responsibilities included significant coordination with local businesses. The $1.2M project was...
276th Street Reconstruction Phase I & Phase II
236th Street Rehabilitation
Burkart Boulevard
Arlington Ave
The Indianapolis Department of Public Works hired RQAW to repair a section of Arlington Avenue. This was an emergency repair project with a 6-week design, contract preparation, bid, and construction complete timeline.
SR 39 ADA Curb Ramps and Sidewalks
RQAW was chosen to upgrade 32 curb ramps along SR 39 from Reagan Street to the north limit in the Town of Clayton. The project goal was to make all ramps ADA compliant; however, our team was able to utilize several innovative solutions throughout the design process....
Carmel Drive and City Center Roundabout
The intersection of Carmel Drive and City Center Drive was a locally funded roundabout project in the City of Carmel. The right-of-way surrounding the site created several complications, so RQAW had to determine the best location to place the roundabout that would...