This project included a new 0.86 MGD lift station and approximately 20-ft deep gravity sewer at the existing Settlement Lift Station site. The goal of this project was to abandon the existing gravity sewer that ties into the Plainfield collection system and construct a new lift station that pumps the sanitary flow to the West Central Conservancy District Wastewater Treatment Plant. The new gravity sewer is approximately 2,300-lf, and ranges in size from 8- to 10-in, and was constructed to capture flow from both the east and west sides of Army Branch Creek. In addition, the station was sized to allow for further development of the surrounding neighborhoods on both sides of the creek.