Old Meridian and Carmel Dr./Pennsylvania Ave.

The project included full-depth QC/QA HMA pavement construction, small structure installations, extensive utility coordination, and ADA concrete curb ramps. Project responsibilities included significant coordination with local businesses. The $1.2M project was completed in 2018. This project replaced a signal-controlled intersection and protected left-hand turning lanes with a 2-lane roundabout. The design avoided a $1.0M relocation on the northeast corner of the project. The intersection improvement upgraded the level of service, improved the overall safety of the intersection, and improved intersection control for the City of Carmel while increasing intersection capacity. RQAW | DCCM replaced the previously signal-controlled intersection at Carmel Drive and Penn Drive. The goal of the design was to create a more consistent and efficient corridor for the traveling public. Upon installation, the roundabout was able to provide an efficient flow throughout the corridor and for neighboring roundabouts. RQAW | DCCM provided the contract administration and construction inspection for this roundabout construction project. Project responsibilities included significant coordination with local businesses.
Scroll to Top