I-70 over US 231 Bridge Reconstruction
Cloverdale, IN
Coordinated design and construction for complete bridge replacement
Challenge: The bridge infrastructure was nearing the end of its service life.
Solution: RQAW provided the contract administrative oversight and construction inspection for the $6.8M INDOT contract B-41328 superstructure and pavement approach replacements near Cloverdale. This reconstruction project included removing and replacing the existing bridge beams, bridge decks, bridge approaches, barrier rail, and full depth pavement approaches for both the I-70 EB and WB structures over US 231. The project included extensive MOT considerations, environmental permit applications, and utility coordination. The project incorporated a post-letting value engineering temporary bridge application which significantly reduced construction cost and time.

HIGHLIGHTS

Cost: $6.8M INDOT contract
Completed: 2021