This project extends from the intersection of State Road 38 in Sheridan approximately 2.2 miles east to Jay Ditch. The project required control and topographic data collection for widening of an existing roadway. A location control route survey was prepared for...
Adams Central is a K-12 school that required a 60,000 square-foot addition to accommodate district growth and new programs. RQAW performed a long-range feasibility study to determine the needs of the existing school and created space programming to meet those needs....
RQAW provided the contract administration and construction inspection for the $7.9M INDOT RS-40753 roadway realignment and reconstruction project near French Lick. The project includes extensive geotechnical considerations, including rock coring, embankment foundation...