Airport Road Realignment
INDOT Vincennes District
RQAW | DCCM provided the contract administration and construction inspection for the $7.9M INDOT RS-40753 roadway realignment and reconstruction project near French Lick. The project included extensive geotechnical considerations, including rock coring, embankment foundation pilings, horizontal drains, and inclinometers. Our construction management team provided oversight and inspection services for these geotechnical mitigations, along with extensive soil and rock embankment construction, chemically modified subgrade treatment construction, full-depth QC/QA HMA paving, and stormwater quality permit installations.